Environmental Monitoring Of The Project For The Installation Of A Hydroscrew For Hydroelectric Generation On The Narcea River (La Florida Dam, Asturias)

Authors:

Pulgar Noriega, A.; Arduengo Sánchez, J.; Sánchez Reguero, A.; Rodríguez García, J.; Villazán Peñalosa, B.; Granero Castro, J.

In 2023, the first hydroelectric power plant in Asturias is built, consisting of two hydro-screws in series.

– Power of 700 kW

– Technology based on the “Archimedes screw”.

– It generates the energy equivalent to the average electricity consumption of 1,000 homes per year.

Environmental monitoring program (PVA): developed to ensure compliance with the preventive, corrective and compensatory measures proposed in:

– Environmental Impact Assessment (EIA)

– Environmental Impact Statement (EIS)

During the phases of:

– Construction: 10 months

– Operation: 5 years

The PVA seeks to reduce, eliminate or compensate for the negative environmental effects that may be caused during the pre-execution, execution and operation phases.