Environmental Monitoring Plan during the Work Phase of the San Andrés de los Tacones Dam Repair Project, Gijón (Asturias).
Environmental Monitoring Plan during the Work Phase of the San Andrés de los Tacones Dam Repair Project, Municipal District of
Environmental Monitoring Plan during the Work Phase of the San Andrés de los Tacones Dam Repair Project, Municipal District of
Environmental Monitoring Plan during the Construction Phase of the Zafra V Photovoltaic Solar Plant Construction Project, Municipality of Zafra (Badajoz).
On-site Environmental Monitoring Plan for the Improvement Project of the Bueres (P.K. 23+650) and Campo de Caso (P.K. 31+141) Sections
Environmental Surveillance Plan during the Construction Phase of the Revilla-Vallejera Photovoltaic Solar Plant Construction Project and Expansion of the Ballestas
From 2012 to the present, at a rate of two annual campaigns, the determination of the ecological potential index of
Environmental Monitoring Plan carried out during the Construction Phase of the Buseco Wind Farm Construction Project and the Electrical Transformer
Since 2015, the study of the trophic status and ecological potential of reservoirs as well as the ecological status/potential of
From 2018 to the present, the study of the water quality of different reservoirs based on the phytoplankton community, determined
In 2020, 2021, and 2022, as part of the maintenance work carried out in different infrastructures of hydraulic power plants
On the occasion of the emptying of the Campañana reservoir, an environmental monitoring plan was carried out which consisted of