Follow-up of the execution of the restoration and landscape integration project of the Nudo Norte Wind Farms (IBERDROLA).
During the execution of the environmental and landscape restoration works of the wind farms that make up Iberdrola’s PPEE Nudo
During the execution of the environmental and landscape restoration works of the wind farms that make up Iberdrola’s PPEE Nudo
Environmental Monitoring Plan during the Work Phase of the Temporary Water Collection Diversion Project of the Navia River, Municipal District
On the occasion of the works to be carried out in the San Andrés de los Tacones reservoir dam, the
A three-dimensional hydrodynamic modeling was carried out to check the possible thermal effect that the discharge from the Castejón power
MEETING GLOBAL CHALLENGES ENVIRONMENT AND SUSTAINABILITY A dispersion study has been carried out to analyze the evolution of the sediment
A study was prepared on the necessary flows to be released continuously, right at the foot of the dam, to
After carrying out a bathymetry of the area where the construction of the launching ramp and its immediate surroundings was
Participation in the Project “Gijón Carbon Footprint Calculation” led by the City Council of Gijón and the Asturian Quality Club,
Environmental Monitoring Plan during the Construction Phase of the Virgen de Areños III Photovoltaic Solar Plant Construction Project and Evacuation
Environmental Monitoring Plan during the Construction Phase of the Buniel Wind Farm Construction Project and Associated Electrical Installations, Municipalities of